Grid Operation Simulator

Match the Net Demand exactly by filling the gap between the Total Demand and Renewables with flexible resources. Minimize the cost while avoiding grid outages.

Send your queries at hello@eshansingh.xyz

Grid Generation & Demand

Summer
1.0s/tick
🐇 🐢

Live Gauges

Delta (Supply - Demand)
-2000 0 +2000
0 MW
Grid Frequency
59 60 61
60.00 Hz

Hourly Capacity Factors

Flexible Generation

MW
Max: ±13,000 MW
Capacity: 52,000 MWh
Ramp: Instant ⚡
Op Cost: $5/MWh
MW
Max: 4,000 MW
Ramp: Full capacity/hr
Op Cost: $2/MWh
0 MW
Online: 0 units (0 MW)
Starting: 0 units
500 MW/unit • 30 units max
Startup: 60-90 min
Min Load: 50%
Cost: $35+$5/500MW
0 MW
Online: 0 units (0 MW)
Starting: 0 units
200 MW/unit • 50 units max
Startup: 10-20 min
Min Load: 0%
Cost: $65+$5/200MW

Game Metrics

Current Time
12:00 AM
✓ Grid Stable
Net Demand
-- MW
Your Total Supply
0 MW
Delta (Supply - Net Demand)
-- MW
Battery State of Charge
20%
0% Capacity: 52,000 MWh 100%
Emergency Alerts
0
Blackouts
0
Current Interval Cost
$0
Total Cost (24hr)
$0

Running Delta (MW)

California Renewable Mix

☀️ Solar
23,274 MW
💨 Wind
6,335 MW
⚛️ Nuclear
2,256 MW
🌋 Geo
2,677 MW
🌾 Biomass
1,249 MW